Knowledge Hub
Understand Dholera SIR Before You Invest
Dholera Special Investment Region is a government-planned greenfield smart city on the Delhi–Mumbai Industrial Corridor in Gujarat. These pages explain how the region is structured, what has already been built, which companies are investing, and what all of it means for a plot or property buyer.
Explore the Region
Six detailed guides covering the development area, planning framework and industrial momentum.
Dholera SIR Overview
What the Special Investment Region is, how it is planned and why it exists.
Why Dholera?
The growth drivers: location, industry, semiconductors, energy, digital and transport.
Interactive Dholera Map
Boundary, TP schemes, infrastructure, properties and nearby destinations on a live map.
Master Plan & TP Schemes
Phase-wise development, land-use zoning and what a TP scheme means for buyers.
Infrastructure & Connectivity
Airport, expressway, roads, freight, power, water and digital — with status labels.
Major Projects
The anchor projects shaping Dholera, each with status, investment and source.
Companies & Industries
Searchable directory of companies reported, approved or exploring Dholera.
Semiconductor Ecosystem
From land to silicon: the fab, its suppliers and the ecosystem around it.
Data Centres & AI
Why Dholera is evaluated for digital infrastructure — and what is not yet confirmed.
Renewable Energy
Solar generation and solar manufacturing powering an industrial region.
Industrial Development
Industrial land, manufacturing, logistics, warehousing and ancillary industry.
Activation Area
The 22.54 sq km first phase where trunk infrastructure is already built.
Utilities & Smart Systems
ABCD command centre, smart utilities, water, power and ICT backbone.
Investment Opportunities
Residential, commercial, industrial and land — plus what to verify before buying.
Dholera FAQs
Title, NA status, registration, NRI purchase, resale and risk factors.
Development Status Dashboard
Where each part of Dholera stands today, by stage — with sources. We publish stages, not invented progress percentages.
Development Dashboard
Where Dholera Stands Today
Status labels only — we do not publish progress percentages, because official completion percentages are not released for most of these works.
Activation Area Infrastructure
Trunk roads, water, drainage, ICT ducting and the ABCD command building in the 22.54 sq km activation area.
Semiconductor Fabrication
Tata Electronics with PSMC — 300mm fab in the Dholera SEZ; ₹91,000 crore proposed investment.
Renewable Energy
300 MW Tata Power Solar plant operating; ReNew reports 2.4 GW module and 2.5 GW cell manufacturing capacity commissioned at Dholera.
Dholera International Airport
Greenfield airport adjacent to the SIR. Commissioning timing is decided by the authorities.
Ahmedabad–Dholera Expressway
Six-lane access-controlled corridor of roughly 109 km; opening subject to final clearances.
Industrial Development
Industrial plots being allotted and developed across activation-area TP schemes.
Commercial & Social Development
Retail, offices, hospitality and social infrastructure are planned to follow employment. Limited built commercial stock exists today.
Data Centres & AI Infrastructure
We have not traced an officially confirmed Dholera data-centre investment. Listed as an opportunity only.
Status Key
- Facility or asset is reported to be running.
- Physical work reported to be in progress.
- Cleared or sanctioned by the relevant authority.
- Publicly announced; implementation not confirmed complete.
- Memorandum, intent or proposal stage only.
- Reported as being studied or assessed.
Talk to a Dholera Advisor
Get a documentation-verified shortlist and a guided site visit.