SK WORLD REALTYDholera SIR · Gujarat

Project Tracker

Major Projects Shaping Dholera

Every project below carries a status label, a reported investment figure only where a source supports it, and a link to that source. Announcements are labelled as announcements — never as completed facilities.

Semiconductor

300mm Semiconductor Fabrication Plant

Tata Electronics with PSMC

Under Construction
Location
Dholera Special Economic Zone
Reported investment
₹91,000 crore proposed investment; about 21,000 jobs projected (government information)

Expected role

The anchor industrial project of Dholera SIR. A wafer fab typically pulls in equipment, materials, testing and packaging suppliers, and creates long-term skilled employment.

Solar Manufacturing

Solar Cell & Module Manufacturing Complex

ReNew

Operational
Location
Dholera SIR industrial area
Reported investment
2.4 GW module and 2.5 GW cell capacity reported commissioned (ReNew FY2025–26 annual report)

Expected role

One of the first large operating manufacturing footprints at Dholera, generating shift-based employment and supplier movement today.

Renewable Generation

Dholera Solar Park (300 MW Tata Power Solar plant)

Tata Power Solar

Operational
Location
Dholera solar park
Reported investment
Not disclosed

Expected role

Utility-scale renewable generation adjacent to planned industrial load.

Source: Tata Power Last updated: September 2026

Aviation Infrastructure

Dholera International Airport

Government of Gujarat / Airports Authority of India (joint venture)

Under Construction
Location
Navagam, adjacent to Dholera SIR
Reported investment
Government-funded; phased development

Expected role

Intended to serve passenger and cargo traffic for the region. Commissioning dates are set by the authorities and have moved before.

Source: Government / press reporting Last updated: September 2026

Road Infrastructure

Ahmedabad–Dholera Expressway

National Highways Authority of India

Under Construction
Location
Ahmedabad to Dholera (about 109 km)
Reported investment
Government-funded national highway project

Expected role

A six-lane access-controlled corridor intended to cut travel time between Ahmedabad and Dholera substantially compared with the existing highway route.

Source: NHAI project information Last updated: September 2026

Urban Infrastructure

Activation Area Trunk Infrastructure & ABCD Building

Dholera Industrial City Development Ltd (DICDL)

Operational
Location
22.54 sq km activation area
Reported investment
Government-funded trunk infrastructure programme

Expected role

Roads, water, sewerage, drainage, ICT ducting and the ABCD command building — the base layer that makes early industrial and residential occupation possible.

Source: NICDC programme information Last updated: September 2026

Energy Storage

Lithium-ion Battery Manufacturing Facility

Tata Chemicals

Announced
Location
Dholera SIR
Reported investment
₹4,000 crore (as announced)

Expected role

Would extend Dholera's clean-energy cluster into cells and storage. Announcement stage — not an operating facility.

Source: pv magazine India Last updated: September 2026

Data Centres / AI Infrastructure

Data Centre & Digital Infrastructure Capacity

Multiple parties (site evaluation stage)

Under Evaluation
Location
Dholera SIR
Reported investment
No officially confirmed Dholera data-centre investment traced by us

Expected role

Dholera's power availability, land parcels and fibre ducting are the attributes data-centre developers look for. We list this as an opportunity under evaluation, not as a committed project.

Source: SK WORLD REALTY research note Last updated: September 2026

Status Key & Data Policy

Operational
Facility or asset is reported to be running.
Under Construction
Physical work reported to be in progress.
Approved
Cleared or sanctioned by the relevant authority.
Announced
Publicly announced; implementation not confirmed complete.
MoU / Proposed
Memorandum, intent or proposal stage only.
Under Evaluation
Reported as being studied or assessed.

Company/project information is provided for educational and informational purposes. Announcements, MoUs and proposed investments do not necessarily represent completed investments or operational facilities. Project status, investment amounts, timelines and employment figures may change. Visitors should verify information through official company and government sources before making investment decisions.

WhatsApp